The Construction Program of EPDM granules Flooring

2019/10/16 10:10:10
The below is the steps which to make the EPDM granules

1 step
Acceptance foundation

2. step
Qualified

3. step
Material and machinery preparation

4. step
EPDM bottom laying

5. step
Color surface EPDM laying

6. step
Laying sun protection layer

7. step
Draw line

1. Basic floor requirements
The basic floor can use asphalt concrete or cement concrete. At the same time, the cement concrete foundation needs to cut the expansion joint. A 28 drying period is required.


 2. Construction begins
  • First clean the surface with butyl ester; the bottom layer should be clear. After cleaning. The basic flooring layer needs to be evenly coated with glue to enhance its adhesion to the ground.
  • Mix the EPDM Granules with the glue according to a certain ratio. And then pour them into the basic flooring. Spread the material with a heating lap. We should flat the seams to keep the whole flat. 
  • Site thickness requirements, Take 13mm as an example: 8mm Bottom layer rubber granules first and surface layer 5mm EPDM granules
  • Measure and draw the Mark line
  • According to the sizes of the designed by the drawing, and draw the marking line of the ground. And proper use the measuring instruments such as theodolites and steel tapes.
           The Ratio of our rubber granules


backing granules 8kg/cm/m2 rubber granule: glue=8:1
EPDM granules 12kg/cm/m2 rubber granule: glue=6:1

The glue means Polyurethane glue